What Does an EV Ready Plan Include?
A professional EV Ready Plan provides a clear, compliant roadmap for bringing EV charging to your building, prepared by qualified BC professionals.
What an EV Ready Plan should include
To meet BC Hydro's rebate requirements and actually be useful to your strata, an EV Ready Plan is a detailed technical document. It typically includes:
- An assessment of current electrical capacity.
- A load management strategy (EV Energy Management System) to share power safely.
- Electrical design and routing plans for conduit and panels.
- A parking strategy showing how each residential unit will get access.
- Cost estimates for the infrastructure installation.
What the plan is designed to solve
The plan solves the "first-come, first-served" problem. By mapping out the electrical approach and parking strategy in advance, the strata council can confidently approve charger requests knowing the building's infrastructure won't be overloaded and that the costs are understood.
Who can prepare an EV Ready Plan in BC
BC Hydro is strict about this: the plan must be prepared by a licensed electrical contractor and/or a professional electrical engineer. You cannot have a general handyman or a well-meaning strata council member write the report if you want it to be valid for rebates.
What documents are needed for the rebate
When applying for the rebate, BC Hydro expects specific documentation. This usually includes the formal EV Ready Plan document itself, a completed EV Ready Plan workbook (provided by BC Hydro), and the invoice or quote from the professional who prepared it.
Questions to ask before hiring a provider
Before hiring a contractor or engineer to write your plan, ask:
- Have you completed EV Ready Plans for strata buildings before?
- Will you handle the rebate paperwork and workbook?
- Is the final report written in plain language that our council can understand?
- Can you also perform the installation work once the plan is approved?
Need a professional EV Ready Plan?
Our licensed specialists create clear, rebate-compliant plans for BC stratas.
Frequently asked questions about EVRP scope and providers
Strata EV Ready Team
BC Electrical Planning Specialists
Last Updated: October 2023
Sources: BC Hydro Program Guide
